Washington Closure Hanford - Projects
Mission Completion Project Library
Most of the following documents are available in Adobe PDF format, and may not be viewed with some older versions of Acrobat Reader. Please use the current version of Adobe Acrobat Reader to view these files.
RCBRA Source and Groundwater Component
Remedial Investigation of Hanford Site Releases the Columbia River
Integration
Long Term Stewardship
Orphan Sites Evaluations
Other Supporting Documentation
| RCBRA Source and Groundwater Component |
Top |
Risk Assessment Documents
Work Plan, DQO and Sampling Documents
Supporting Technical Information
- Guided Interactive Statistics Decision Tools (“GiSdT”) - The data being used in the Risk Assessment is available via a web-based program. For access, e-mail your name, e-mail address, and affiliation to mailto:rcbra@gisdt.org. Use the QuickStart Instructions for assistance.
- White Paper: COPC Refinement
- White Paper: Representative Concentrations Methodology
- MTCA and CERCLA Requirements Crosswalk
- RCBRA Stack Air Emissions Deposition Scoping Document (DOE/RL-2005-49, Rev 0) [pdf, 370 kb]
- Reference Site Selection Rationale for the 100 Area and 300 Area Component of the River Corridor Baseline Risk Assessment
- Additional Information on Reference Areas for the River Corridor Baseline Risk Assessment
- Inter-Areas Component of the River Corridor Baseline Risk Assessment Sampling Summary (WCH-274, Rev. 0) [pdf, 7MB]
- 100 Area and 300 Area Component of the river Corridor Baseline Risk Assessment Spring 2006 Data Compilation (WCH-139) [pdf, 872 kb]
- 100 Area and 300 Area Component of the RCBRA Fall 2005 Data Compilation (WCH-85, Rev 0) [pdf, 1.7 MB]
- Literature Review of Environmental Documents in Support of the 100 and 300 Area River Corridor Baseline Risk Assessment(PNNL-SA-41467) [pdf, 7.4 MB]
- Fall 2005 MIS data results (in support of WCH-85) [MS Excel]
- Fall 2005 Well Sample Results (in support of WCH-85) [MS Excel]
- Polychlorinated Biphenyl Presence in the Columbia River Corridor, WCH-208, Rev.0
- 2003 Reactor Area Shoreline Radiological Survey Maps
- Public Communication Plan for the 100 Area and 300 Area Component of the River Corridor Baseline Risk Assessment (DOE/RL-2003-65, Rev 0) [pdf, 1 MB]
- Trustee Communication Plan for the River Corridor Baseline Risk Assessment Project (DOE/RL-2003-67, Rev 0) [pdf, 1 MB]
- 100 Area and 300 Area Component of the River Corridor Baseline Risk Assessment: Basis and Assumptions on Project Scope (DOE/RL-2003-61, Rev 0 ) [pdf, 2MB]
Meetings and Workshops
- January 10-11, 2008 RCBRA Workshop
- October 30, 2007 - RCBRA Workshop - Meeting notes, Presentation
- July 25, 2007- RCBRA Workshop – Meeting notes
- May 16, 2007 - RCBRA Workshop - Meeting notes, Presentation
- March 21, 2007 - RCBRA Workshop - Meeting notes, Presentation
- January 16, 2007 - RCBRA Workshop - Meeting notes, Presentation
- December 14, 2006 - RCBRA Workshop - Meeting notes, Presentation
- November 15, 2006 - RCBRA Teleconference - Meeting notes, Presentation
- October 17-18, 2006 - RCBRA Workshop
- September 19, 2006 RCBRA Workshop - Meeting notes, Presentation
- August 16, 2006 RCBRA Workshop - Meeting notes, Presentation
- July 19, 2006 - Human Health Introduction Workshop – Meeting notes
- July 12-13, 2006 - SAP Refinement Workshop
- June 1-2, 2006 - SAP Refinement Workshop
- August 9-10, 2005 - 100-B/C Pilot Risk Assessment and 100/300 Areas Sampling and Analysis Plan – Meeting notes [pdf, 37kb]
- January 6, 2005 –100 and 300 Area River Corridor Baseline Risk Assessment DQO Meeting, ERAGS Step 4 and Sampling and Analysis Plan Overview - Meeting notes [pdf, 717 kb]
- November 23, 2004 – 100 and 300 Area River Corridor Baseline Risk Assessment DQO, ERAGS Step 4 - Meeting notes [pdf, 1.4 MB]
- October 13, 2004 – 100 and 300 Area River Corridor Baseline Risk Assessment DQO/ERAGS Step 3 - Meeting notes [pdf, 134 kb]
100-B/C Pilot Documents and Information
- 100-B/C Pilot Project Risk Assessment Report, DOE-RL-2005-40, Draft B, Volume 1 [pdf, 3.8 MB]
- 100-B/C Pilot Project Risk Assessment Report, DOE-RL-2005-40, Draft B, Volume 2 - Tables [pdf, 3.3 MB]
- 100-B/C Pilot Project Risk Assessment Report, DOE-RL-2005-40, Draft B, Volume 3 - Appendices [pdf, 3.2MB]
- 100-B/C Area Ecological Risk Assessment Data Quality Objectives(BHI-01673, Rev 0) [pdf, 11 MB]
- A Preliminary Evaluation of Post-Remediation Protectiveness of Humans and the Environment at the 100-B/C Area (BHI-01669, Rev 0 ) [pdf, 11MB]
- Conceptual Site Model for the 100-B/C Pilot Project Risk Assessment(BHI-01706, Rev. 0) [pdf, 2.3 MB]
- 100-B/C Pilot Project Data Summary for 2003 and 2004(BHI-01724, Rev 0 ) [pdf 2.1 MB]
- 100-B/C Pilot Project Field Sampling Plan for 2004(DOE/RL-2004-53, Rev. 0 ) [pdf, 1.1 MB]
- 100-B/C Area Ecological Risk Assessment Sampling and Analysis Plan (DOE/RL-2003-08, Rev 0) [pdf, 9 MB]
- Methodology and Approach for Ecotoxicological Screening Value Identification and Exposure Estimation for the 100-B/C Area Ecological Risk Assessment – Technical Memorandum [pdf, 606kb]
|
| Remedial Investigation of Hanford Site Releases to the Columbia River |
Top |
Remedial Investigation Documents
Supporting Technical Information
- Columbia River Component Data Gap Analysis (WCH-201, Rev 0, October 2007)
- Columbia River Component Data Evaluation Summary Report (WCH-91, Revision 0) [pdf, 17 MB]
- Existing Source Information Summary Report Compilation/Evaluation Effort: December 2004 to September 2005, January 2006 (WCH-64, Rev 0) [pdf, 1.7 MB]
- Association of Hanford Origin Radionuclides with Columbia River Sediment, BNWL-2305, Robertson, D. E. and Fix, J. J., August 1977 [pdf, 6.3 MB]
- Survey of Potential Hanford Site Contaminants in the Upper Sediment for the Reservoirs at McNary, John Day, The Dalles, and Bonneville Dams, 2003; DOH-320-034, PNNL-14878, WDOE 04-05-016, ODOE NUC-007; February 2005 [pdf, 420 kb]
- Columbia River Component of the River Corridor Baseline Risk Assessment Project: Basis and Assumptions on Project Scope (DOE/RL-2004-49, Rev 0) [pdf, 819 kb]
Fact Sheets
Meetings and Workshops
- February 26, 2009 - Sturgeon Workshop
- April 17, 2008 - DQO/SAP Workshop
- February 5-6, 2008 - Remedial Investigation DQO Workshop
- June 5-6, 2007 - Data Gap Analysis Workshop
- August 16, 2005 - Columbia River Workshop – Meeting Notes [pdf, 112kb]
- July 19, 2005 - Columbia River Workshop – Meeting Notes [pdf, 127kb]
- June 22, 2005 - Columbia River Workshop – Meeting Notes [pdf, 128kb]
- May 24, 2005 - Columbia River Workshop – Meeting Notes [pdf, 155kb]
- May 17, 2005 - Columbia River Workshop – Meeting Notes [pdf, 107kb]
- April 19, 2005 - Columbia River Workshop – Meeting Notes [pdf, 104kb]
- March 15, 2005 - Columbia River Workshop – Meeting Notes [pdf, 144kb]
- February 15, 2005 - Columbia River Workshop – Meeting Notes [pdf, 157 kb]
- January 24-25, 2005 - Columbia River Workshop – Meeting Notes [pdf, 1.4 MB]
- December 13-14, 2004 - Initiate Collection and Evaluation of Existing Data On Hanford Site Releases to the Columbia River – Meeting notes [MS Word, 312 kb]
|
| Integration |
Top |
|
| Long Term Stewardship |
Top |
|
| Orphan Sites Evaluations |
Top |
100-K Area
100-D Area
100-H Area
100-IU-2 and 100-IU-6
100-BC Area
100-N Area
|
| Other Supporting Documentation |
Top |
- Strontium-90 Treatability Test Plan for 100-NR-2 Groundwater Operable Unit, December 2005, DOE/RL-2005-96, Draft A [pdf, 3.7 MB]
- Aquatic and Riparian Receptor Impact Information for the 100-NR-2 Groundwater Operable Unit [pdf, 17 MB]
- 100-NR-2 Study Area Ecological Risk Assessment Sampling and Analysis Plan (DOE/RL-2005-22, Rev 0)
- Evaluation of Strontium-90 Treatment Technologies for the 100-NR-2 Groundwater Operable Unit [pdf, 1.5 MB]
- Evaluation of Aquatic and Riparian Receptor Impacts at the 100-N Area: Literature and Data Review [pdf, 2 MB]
- Survey of Radiological Contaminants in the Near-Shore Environment at the Hanford Site 100-N Reactor Area (PNNL 11933) [pdf, 4 MB]
- Hanford Site Background: Evaluation of Existing Soil Radionuclide Data, DOE/RL-95-55, July 1995, Rev. 0 [pdf, 3.5 MB]
- The Hyporheic Zone: Biogeochemical Processes at the Surface - Groundwater Interface [pdf, 1 MB]
- River Corridor End State Strategy (WCH-8, Rev 0) [pdf, 769 kb]
|
|